china incinerator manufacturer and exporter

Primary Combustion Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Removed Door: Provided with refractory lining with sealing gaskets Outer Body MOC: Mild Steel, 5mm Primary Chamber: Stainless Steel Operating Temperature :800. ± 50◦C Insulation: Insulation Brick Heating Elements Type: Kanthal Al Grade Power Consumption: 75 […]

Mobile Cremation Instruments

Layout CA-200 Picture Burning Rate Ordinary 100 kgs/hour Key Burning Chamber 2000 Liters Extra Burning Smokeshaft Yes Feed Setting Guidebook Voltage 220V Power 3.0 Kw Fuel Kind Diesel Oil Heater Italy Original Oil Use (Diesel Oil) Normal 53 kg/hour Inside Dimensions 230 x 100 x 90cm (key chamber) External Dimensions […]

Burner for medical center waste monitoring

Heater for health care facility waste surveillance with the adhering to attributes: – – In high temperatures( pyrolytic burner 2 chambers with temperatures varying from 950 º C to 1320 º C; – – Capability to damage of 400 to 600kg per hr; – – Effective in ruining germs; – […]

Medical Center Waste Monitoring

Hospital Waste Management as well as Competitive prices as Pakistan is a competitive market. We have a complete setup with Office, Customer Relations, Import / Export, Biomedical Department, Application Support Department & Project Designing Department.Description        Minimum Requirements Design standard    Multiple chamber incinerator to the design of EPA  standards, Air […]

Top Feeding Door Solid Waste Incinerators HICLOVER

HICLOVER Top Feeding Door Waste Incinerators ▲▲▲Large Feeding Door ▲▲▲Better for Animal Waste Cremation ▲▲▲HICLOVER Brand Section ***Primary Combustion Chamber ***Secondary Combustion Chamber ***Smoke Filter Chamber ***Optional Wet Scrubber System(1 section or  3 sections) Phone: +86-13813931455(whatsapp/wechat)Website: http://www.hiclover.com/  Email: [email protected]Email: [email protected]   Nanjing Clover Medical Technology Co.,Ltd. Items Side Loading Door Top Loading Door Cost Cheap High cost Manufacture […]

dispose Medical waste IV

the incinerator can be made use of to do away with Clinical waste IV, used needles, utilized syringes, scalpels, made use of dressing product, private security gadgets like gown, gloves and so on truncated body components, excreta from clients and also various other research laboratory waste.incineration tools that can deal […]

low-cost medical waste incinerator

Stack: Type:  Wire Supported MOC:  Mild Steel of ISstd Height :3 Meters or more • PROCESS AT LEAST 1 METRIC TON OF WASTE PER DAY • OPERABLE BY 1 PERSON, WITH NO TRAINING REQUIRED • REGULAR MAINTENANCE CAN BE COMPLETED BY 1 PERSON WITH LIMITED TRAINING • REGULAR MAINTENANCE SHOULD […]

STRONG WASTE BURNER

Primary chamber – Consists of a monolithic high grade refractory concrete with high grade insulation backing, . Utilising a refractory hearth or equivalent for continuous ash removal. Secondary Chamber – Consists of high density, low thermal mass refractory ceramic fibre with an innovative low emissivity protective coating. bio medical waste […]

animal cremation

Technical Specifications of External SHREDDER Controls: Pre-programmed PLC controlled Password activated and reversal history indication Motor starter with overload protection Automatic instantaneous stop on hard object in shredder bed Automatic heavy cutting load reversal and re-try , up to three times Control housing Nema type 12   Cutting Hardwires: Chamber […]

dual chamber burner

Waste calorific worth: 4000KCAL/KG Moisture Web content: 10-25%. Small Ability: 50Kg/Hour set load. Additional Chamber: 2 Secs @ 850degrees C The main burning chamber must make certain very little separation temperature degree is not much less than 850 degrees C. INSULATION. Calcium Silicate. Restricting Constant solution restriction 1000 degrees C. […]

nanjing clover incinerator price

Significant incinerators – – – – INDUSTRIAL INCINERATORS – – – specifications listed below. 2.) Measurement requirement for the heaters is 750 — — — — 850 kg ability 3.) The bum price require to be 80 LL 100 kg/ hour. 4) The key chamber shouId have an operating temperature […]

healthcare facility burner

Supply, arrangement and also screening of medical waste burner with an ability of 75 kg/ human resources gas (LPG) total amount with all devices and also as a result with the chimney based on the technical specs along with problems of public wellness make a room for the burner that […]

hog incinerator

(B) Features and Specifications  of the Steam Boiler: Features of the Boiler: It must be an Electrical boiler Splash proof electric enclosure and switches Door Isolator to main electric enclosure Alarm lights and Safety/protection against excel pressure Level control on feedback water tank   Technical Specification of the Boiler: Output: […]

pet burners up for sale

SMART ASH INCINERATORS FOR THE DISPOSAL OF HAZARDOUS WASTE ? Quantity: 20 systems ? The Burner collaborates with a 55 gallon open ended up steel drum ? The system operates without fuel as well as used just 120v or 220v electric power for the blowers ? Unit can melting oil […]

tiny range burner

It must have the capacity to run not less than 10 hours/day This burner must be able to wreck all flammable wastes produced by medical centers, personal facilities, study laboratories, institutes, and also so on. 400 and its elevation: 8 m The Quantity of the burning chamber a minimum of: […]

clinical incinerators

● Able to drop 25-30kg per hour ● Contain 2 chambers to ensure significant decline in exhaust ● Be capable of temperature degree in series of 800c to 1000c ● Low upkeep style ● Has to be Fuel ● Required greater than 15amp 220- 250V power ● kW Intake power […]

hog incinerators

The purpose of the start-up burner is to ignite waste materials and to maintain the prescribed minimum temperature in the primary chamber. It shall be mounted in the lower part of the primary chamber.   The start-up burner shall function automatically when:-   –      Pre-heating is completed, or after reaching […]

laboratory heater

the entire carcass of animals (cattle, steeds, Sheep, pigs, and more), along with normally contaminated materials Products in the gas stove. ? Opening Doors – – – – the closure as well as additionally dependency automatic system, Which are dealt with from another area by the operator. ? made to […]

medical incinerator producer

1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as well as 170% -120% of stoichiometric amount specifically. Circulation meter/suitable circulation measurement tool shall be supplied on the key and second air ducting. The combustion […]

burner manufacturers

1. SCOPE OF FEATURE The work specified in the agreement will certainly consist of. 1. Supply, place as well as assign a heater as given in the technological specifications 2. Specification for adherence to OSHA along with other legal demand associating with Health and wellness of staff members throughout execution […]

pet crematory

The temperature is over the minimum and under the maximum required temperature (e.g 1150?C) of the thermal reactor (partial load).   When switching off, only the solenoid valve for the fuel supply closes, the burner fan stays on to cool and protect the burner head.   The reactor burner shall […]

manufacturer of ha zardous waste incinerator in china

Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system Imputing door Mouth Width (mm): 760*760 (approx.) Chimney External Diameter (mm): 300 ± 10 Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max) Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h Voltage: 380v/220v AC, Warranty: 1 Year, 50 […]

small incinarator

heavy Duty Steel casing   High Quality refectory lining & insulation   1 x Diesel fired ignition burners operated on / off   Front Loading Door (safety catch   Separate Ash removal Door     2.7  CONTROL UNIT   The entire processing cycle and the combined effect of the individual […]

small home incinerators

Equipment Access Openings: Arrange all equipment and piping to allow access to openings without disassembly of equipment or piping. Provide space which permits full opening of all doors, panels, and other access openings.   Operating Space: Do not reduce or alter personnel working spaces shown except with prior approval of […]

diesel oil fired medical waste incenerator

High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber (double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel Power Supply for control box 220V-240, single phase 50-60Hz Minimum operating temperature 1200 oC One year spare parts package for complete maintainability 10m hose pipe. […]

pet animal cremation equipment

A chamber of post combustion of gases * A burner of combustion of gases, * A device of injection of air allowing a total recombustion of gases, * A device of air inlet of cooling of waste gases, * A sheath of evacuation of the gases burnt. * Carcass in […]

msw incinerator manufacturers

standard type, 11m long ,self supporting Capacity-220kgs/hr refuse-hospital waste average moisture-15-20% on fist time DIMENSIONS height: 2710mm length: 2840mm Width; 2450mm loading door opening: 610mm x 610mm Grate/Heath Area: 2.0(square meters) Primary chamber volume: 2.4(cubid  meters) secondary chamber volume :2,72(cubid meters0 total volume: 5,12(cubid meters) minimum stack diameter :560mm   […]

Hiclover bio waste incineration

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce. ※ Main Quality:— — — — — Dual Burning Chamber — — Dual Italy Burner – – Burning Cost: 10-100kgs per hr–– – – Burning Chamber: 0.1M3-1.2 M3— — — — Mobile Incinerator, Requirement delivery containers, Easy to move/transport system— — — — Free Installment, Pre-installed heater, Suitable for […]

medcial incinerator manufacturer

The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests so as to enable sending of one CEB Engineer for witnessing  of  the  factory  tests.    A  ‘Factory  Acceptance  Test ’  schedule  shall  be   mutually agreed between the successful […]

محرقة طبية 10 كجم / ساعة

وصف المنتج استجابة التكنولوجيا (الأسئلة الشائعة) س: ما نوع النفايات التي يمكن استخدامها في هذا الجهاز؟ ج: هذه المعدات للنفايات الطبية ، والحيوانات الأليفة ، والنفايات البلدية ، والنفايات الحية. يحظر المواد المتفجرة والإشعاعية والنفايات السائلة والغازات. س: معيار الدخان المحرقة ج: معيار الحكومة الصينية: رقم GB18484-2001. س: القدرة على […]

incinerators manufacturers china

The incinerator shall then take supply from the DO tank through its DO feed pumps to its respective burners. An integrating meter shall be installed to measure the volume of DO consumed by the incinerator. Suitable pre metering strainers shall be provided together with a lockable by-pass across both strainer […]

incinerator capacity calculation

Test shall be conducted by factory authorized representative of incinerator manufacturer.   Demonstrate required weight reduction of specified waste. Waste shall be fed in a single batch to the unit. After termination of manufacturer’s predicted burning period, inspect and weigh the residue.   Emissions testing may be deleted if not […]

hazardous waste incinerators in china

Anchor all equipment to building floor or structure as shown or as recommended by manufacturer with allowance for thermal expansion as necessary.   Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so that all control switches and indicators are within 1700 mm (5.5 […]

hospital incinerator manufacturers

The incinerator fuel tank shall meet the following requirements: a) The tank shall be installed above ground and according to all of the fuel tank requirements in Section 1015 including secondary containment. b) The tank shall be sized to hold a 14 day supply of diesel fuel   6) Manufacturer […]

incinerator burners

Fully automatic sequential control provided by internal PLC system providing control of: Secondary chamber pre-heat Burn cycle (variable) Cool down cycle Fuel Options Diesel, LPG, Natural or Bio Gas. Typical Fuel Consumption Diesel: 8 / 10 litres per hour Liquid Propane Gas: 6 / 8 litres per hour Natural Gas: […]

large scale incinerator

Programming controls. Programming controls should be verified as controlling and cycling the unit in the intended manner. Proper prepurge, ignition, postpurge, and modulation should be verified. A stopwatch should be used for verifying intervals of time. ?     Fuel supply controls. The satisfactory operation of the fuel control solenoid valves for […]

Concerning Medical Waste

Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone else coming into contact with the often hazardous materials discarded by hospitals and other healthcare sites. Hospital waste varies from site to site and the biggest challenge is to dispose of this wide range of waste streams. Incineration is still the preferred way to process medical waste without endangering the heath patients, staff or anyone else coming into contact with them. Clinical waste is costing more and more to dispose of safely. Health Clinics and Health center can now handle their own waste streams using one of our specialist medical incinerators. Destroying hazardous waste at source is by far the most effective and efficient way of handling waste that could potentially spread diseases or viruses. Requirement 20% -25% of the full waste created by medical treatment facilities is associated to as hazardous and also might develop a selection of health as well as environmental threats if not managed and also harmed in a correct means. HICLOVER is now offering a full range of medical waste incinerators, designed to provide efficient waste destruction, utilizing best available technologies and environmentally friendly process. Due to the secondary chamber with its 2 second retention period, our medical incinerator range is well suited to process medical waste. Our products make sure reliable, neat as well […]

animal crematorium equipment

I also research their product details and find it don’t require fuel and also not require fan blower but that incinerator can only burn waste with 30%-40% humid. I see if your products can burn waste with 30%-40% humid without fan blower and more 40% humid require fan (Optional solution) […]

animal incinerators china

Incinerate: medical waste and general waste Capacity to burn waste: 400-500kg/hr Fuel: Diesel Fuel Consumption: 10 liters/hr maximum Incineration temperature: 950-1300 degrees centigrade Casing: thick (min 5mm) stainless steel casing and fully insulated to withstand sea humidity Voltage 220/240v or 380/415V Frequency 50Hz Feeding: Automatic Ash/leftovers removal: Automatic Flue gas […]

laboratory incinerator china manufacturer

Incinerator dual chamber with capacity 1.5 m3/batch or 6 m3/ day, digital thermocontrol range 0‐1200 C, thermocouple, air supply capacity 10m3/ minute, power consumption 1.2kWH/ hour, power 3 phase with netral, cooling water sprinkler capacity 5L/ minute, completed with refractory (insulation, castable, ceramic blanket) and PLC SUPPLY, INSTALLATION AND COMMISSIONING […]

smart ash incinerator price

Flue Gas Cleaning   System   ? Wet Scrubber   ? Electrostatic precipitation in combination ( Optional: Rate to be   quoted separately)     7 Chimney Height 10m (minimum)       ?     Total duration of the supervision of installation, testing and commissioning works shall not exceed 2 weeks. […]

incineration combustion chamber

Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labour and heavy duty equipment shall be provided by CEB.     ?     The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its procedures for the installation of the […]

pet cremation incinerators

The successful bidder shall deliver the incinerator skid in a container. The container will be emptied by CEB and returned to the successful bidder / or to its shipping agent. A containerized solution is also acceptable. Electrically operated 220 volt ( 60 Cycle – 1 phaze ) Able to complete […]