Google快讯 – medical waste

medical waste 实时更新 ⋅ 2019年10月2日 新闻 TerraCycle reports boosted sales and income numbers Plastics Recycling Update This segment manages lamps and bulbs, batteries, scrap electronics, organic waste, medical waste and other materials. This decrease was “partially … 标记为不相关 Community news Chicago Tribune Controlled medications, compressed gas cylinders, latex paint, medical waste, asbestos, grill propane cylinders, commercial… Continue reading Google快讯 – medical waste

GoGreen! US EPA October 2019 Newsletter

GO GREEN! EPA News You Can Use – October 2019 https://www.epa.gov/newsroom/gogreen IN THIS ISSUE: Enviro-Tip of the Month Recent News What You Can Do, What You Can Use En español: Spanish Feature Multimedia Upcoming Events and Opportunities About This Newsletter   —————————– ENVIRO-TIPS OF THE MONTH October is Children’s Health Month. Children are often more… Continue reading GoGreen! US EPA October 2019 Newsletter

EPA News: EPA Approves Virginia Plan to Improve Water Quality

Contact: R3press@epa.gov EPA Approves Virginia Plan to Improve Water Quality PHILADELPHIA (October 2, 2019) The U.S. Environmental Protection Agency today announced it has approved and helped fund a $100 million plan by Virginia to implement key water infrastructure projects, including upgraded wastewater treatment plants to better serve residents, increase efficiency and reduce pollution. Virginia’s Intended… Continue reading EPA News: EPA Approves Virginia Plan to Improve Water Quality

EPA News: EPA Approves Maryland Plan to Improve Water Quality

Contact: R3press@epa.gov EPA Approves Maryland Plan to Improve Water Quality PHILADELPHIA (October 2, 2019) The U.S. Environmental Protection Agency today announced it has approved and helped fund a $297 million plan by Maryland to implement key water infrastructure projects, including upgraded wastewater treatment plants and stormwater control measures to better serve residents, increase efficiency and… Continue reading EPA News: EPA Approves Maryland Plan to Improve Water Quality

Google快讯 – medical waste

medical waste 实时更新 ⋅ 2019年10月2日 新闻 Predictive Oncology Inc. (POAI) Sells 10 STREAMWAY® Systems to Prominent Teaching Hospital GlobeNewswire (press release) Skyline Medical, a subsidiary of POAI, continues to forge the standardization of waste fluid management with its sale of 10 systems in Rochester, NY. 标记为不相关 AIIMS take pledge to Reduce, Reuse and Recycle plastic… Continue reading Google快讯 – medical waste

Google快讯 – incinerator

incinerator 实时更新 ⋅ 2019年10月2日 新闻 Incinerator breakdown sent hundreds of tonnes of Cornwall's rubbish to landfill Cornwall Live The Cornwall Energy Recovery Centre burns waste to produce electricity to help cut down on the amount Cornwall sends to landfill sites, but it was … 标记为不相关 Missed deadline | Incinerator still 'undergoing repairs' BVI News Online Now… Continue reading Google快讯 – incinerator

Google快讯 – medical waste

medical waste 实时更新 ⋅ 2019年10月2日 新闻 Sharps Containers Market Is Expected to Reach USD 624.1 Million by 2026; Rising Need for … GlobeNewswire (press release) Additionally, out of the total medical waste generated, 85% consists of general, non-hazardous waste and 15% of hazardous waste. This generated … 标记为不相关 Hazardous waste, paint to be collected My Citizens… Continue reading Google快讯 – medical waste

Google快讯 – waste incinerator

waste incinerator 每天更新 ⋅ 2019年10月2日 新闻 Thousands of tonnes of rubbish sent to landfill after incinerator breakdown Cornish Stuff (press release) An extended shutdown of Cornwall's waste incinerator led to almost 1,300 … broke which meant it was unable to generate electricity from the waste. 标记为不相关 Incinerator breakdown sent hundreds of tonnes of Cornwall's rubbish… Continue reading Google快讯 – waste incinerator

US EPA Notice of New Litigation

US EPA Notice of New Litigation RE: Notice of Lawsuit Filed Against EPA – Big West Oil LLC v. EPA, No. 19-9576 (10th Cir.) The U.S. Environmental Protection Agency has recently received a petition for review in the above-captioned case that may be of interest to you. This information is provided for your information only, and… Continue reading US EPA Notice of New Litigation

Incinerators with chimney

•     the thickness of the door of 150 mm and a hardness of not less than 170 kg / m 3 to be burnt, automatic comprehensive remote system.•    Furnaces must be destructive enough to burn and incinerate the material which mentioned previously •   furnaces must have certificates are supported global enterprises and government competent for environmental protection In the country of origin or the General Presidency of Meteorology and Environment Protection in Saudi Arabia•    The oven can work for 24 hours so as to allow for the burning of materials for a period of not less than 12 consecutive hours and the remainder for cooling and provides full fuel tank with a capacity of 1000 L to turn on the oven.•    Must have an automatic ignition and diesel is used•    a furnace has the ability to withstand extreme temperatures up to “130o c And also, it guarantees continuous operation of which can be utilized for 24 hours with the ability to remove residues during the work of the oven, Insulating layer of calcium must be present in the rooms with Thickness not less than 50 mm and a wall thickness of 100 mm •    Isolation of burning room: the space between the walls must be of the “stainless steel”. In addition, burn room must fill with Thermal insulation material.•    Ensure that the combustion of materials emitted in the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers•    Incinerators must contain a system for processing (purification) gasses before emission of the smoke.•     Incinerators must have the capacity of self-cooling after the end of the daily operating period.•    Incinerators must have chimney not less than “4 meters” height from the surface of the oven, also, it must be thermally insulated and non-rust able, and must also be removable, installation and tide default.•    Electrical capacity required “220/ 380-volt “60 hertz •    Incinerators must be fitted with a control panel of the electronic keys to monitor all the necessary indicators of activation keys, as well as start-up and switch off so as to be isolated inside a metal box with the presence of the following:Alarm Sensor in the event of (crashes “burner” or purification device or heat leakage       or internal connections and wiring)Monitors for the temperature of the rooms Aerosols Filter indicators/ monitorsRoom temperature sensors Indicators for furnaces and index overloadTimer for Extinguish the oven automatically depending on the time required. •    All equipment must be highly resistant to external conditions such as high temperature (50oc) •    All doors must have special lock are not allowed non-persons appointed to work.•    Providing fire extinguisher for each site with a capacity of 10 kg at least